Squeezing it in all in

A cyclist rides on a paved path marked with yellow dashes, surrounded by lush green trees and a series of catenary masts running alongside train tracks.

Cycled a loop along mostly rail trails today. The Kenilworth Corridor, shown here, had been closed for several years during the construction of the Green Line light rail. I’ve really missed this connector between two other rail trails. From left to right, there’s a pedestrian path, a two-lane cycle path, the LRT, and just enough room to squeeze in a freight line.

A cyclist rides on a paved path marked with yellow dashes, surrounded by lush green trees and a series of catenary masts running alongside train tracks.
Categorized as Cycle

Leave a comment

Your email address will not be published. Required fields are marked *